热门标签

皇冠足球投注平台:Pansar eyes key role in state development

时间:1周前   阅读:4   评论:3

欧博手机版www.aLLbet8.vip)是欧博集团的官方网站。欧博官网开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。

Pansar's chairman, Datuk James Tai Cheong, said Pansar aims to play a role in the state infrastructure development via projects such as the Sarawak Second Trunk Road project, upgrading of state coastal roads, road linkages to villages, water supply grid programme, rural electrification as well as telecommunication infrastructure projects.

KUCHING: Pansar Bhd is eyeing more key infrastructure projects listed by the Sarawak government in its Post Covid-19 Development Strategy 2030 (PCDS 2030).

Its chairman, Datuk James Tai Cheong, said Pansar aims to play a role in the state infrastructure development via projects such as the Sarawak Second Trunk Road project, upgrading of state coastal roads, road linkages to villages, water supply grid programme, rural electrification as well as telecommunication infrastructure projects.

Among the initiatives and major projects planned under PCDS 2030 that were highlighted by Sarawak Premier Datuk Patinggi Abang Johari Tun Openg at its launch in July 2021 are the development of autonomous rail rapid transit Kuching Urban Transportation System (estimated cost of more than RM5bil), expansion of terminals at the Kuching and Sibu Airports and new deep sea ports at Kuching and northern Sarawak.

The new key industrial projects include the development of Petrochemical Hub and bio-industrial park in Bintulu, which is currently underway, as well as free industrial zones around the new deep sea ports as well as a furniture park and extension of the Samajaya Hi-Tech Park.

To support the industrial development, a Pan Sarawak gas pipeline will also be built.

The PCDS 2030 has seven strategic thrusts and is anchored on six economic sectors as the main engines of growth, which will be supported by seven enablers.

,

皇冠足球投注平台www.hg9988.vip)是皇冠体育官方投注平台,开放皇冠信用网代理申请、信用网会员开户,线上投注的官方平台。

,

Tai said Pansar is currently constructing the Batang Lupar bridge, the longest riverine bridge in Malaysia, in Samarahan Division.

The Batang Lupar bridge, with a contract value of RM848.8mil, is one of the nine major bridges to be built under the Sarawak coastal road network which stretches a massive 896km. Several other bridges are also in various stages of construction

The on-going 225km Second Trunk Road project will become an alternative road to the Sarawak Coastal Road and Pan Borneo Highway network which will significantly shorten the travelling time from Kota Samarahan to Sibu.

Most of the work packages under Pan Borneo Highway Sarawak are due for completion this year.

Tai said other notable infrastructure projects Pansar is implementing now are the Universiti Malaysia Sarawak Teaching Hospital (worth RM486mil), mechanical and engineering works on the Shell Headquarters in Miri and retrofitting of the Sarawak Timber Industry Development Corp building in Kuching.

Pansar’s total order book for these projects (including Batang Lupar bridge) is RM1.4bil.

上一篇:竞彩推荐:Những ngày cuối cùng của Bác Hồ

下一篇:xsmb 30 ngày:日圆穿151创32年新低

网友评论

  • 2022-09-07 00:37:51

    This includes Minneapolis Fed president Neel Kashkari, who said that he wants the Fed’s benchmark interest rate at 3.9% by the end of this year and at 4.4% by the end of 2023.水平一流

  • 2023-03-18 02:03:19

    具体来看,此次广州市发布的20条措施中,涉及到多条以真金白银为基础的奖励措施,核心旨在提升广州市的汽车产业链自主创新与核心竞争力。 很正能量